Sunday, 1 November 2026
Standing Office 81 (SOVNPA 81) emblem Viet Nam NVietnam National Presiding Agency
on Countering the Proliferation of Weapons of Mass Destruction
Standing Office 81

9.B.5.On-line (real time) control systems, instrumentation (including sensors) or automated data acquisition and processing equipment, specially designed for use with any of the following:

List
Wassenaar Arrangement – List of Dual-Use Goods and Technologies – WA-LIST (25) 1
Corresponding EU entry
9B005
a. Wind tunnels designed for speeds of Mach 1.2 or more;
Note 9.B.5.a. does not apply to wind tunnels specially designed for educational purposes and having a 'test section size' (measured laterally) of less than 250 mm.
Technical Note
For the purposes of 9.B.5.a. Note, 'test section size' means the diameter of the circle, or the side of the square, or the longest side of the rectangle, at the largest test section location.
b. Devices for simulating flow-environments at speeds exceeding Mach 5, including hot-shot tunnels, plasma arc tunnels, shock tubes, shock tunnels, gas tunnels and light gas guns; or
c. Wind tunnels or devices, other than two-dimensional sections, capable of simulating Reynolds number flows exceeding 25 x 10⁶.